Rights and Obligations of Consumers

What IESCO Staff Can Do at Your Property

An authorized IESCO employee can enter your premises to inspect meters, wiring, or supply equipment – but only after giving you 24 hours’ notice, except in suspected theft cases, where no notice is required. They can also remove IESCO-owned equipment once supply is no longer needed.

What You’re Required to Do

  • Give reasonable access to your meter and IESCO-owned equipment for installation, maintenance, or removal.
  • Allow inspection when requested – refusing for an unreasonable period can itself lead to disconnection.
  • If your premises is locked/unoccupied, IESCO will schedule a meter-reading appointment, valid for up to 2 months before a new appointment is needed.

Who’s Liable for Damage

  • IESCO isn’t responsible for damage caused by your own negligent use of appliances or equipment.
  • You’re responsible for any damage to IESCO’s meter or equipment caused on your premises – including damage from electricity, water, steam, or chemicals – except normal wear and tear or IESCO’s own equipment defects.

If Something’s Out of Your Control

IESCO isn’t liable for supply failures caused by Force Majeure (events genuinely outside anyone’s control).

Equipment That Needs Special Handling

If you run equipment that causes voltage fluctuations – welders, X-ray machines, elevators, compressors, furnaces – you’re required to limit the disturbance when IESCO asks, and larger units (X-ray over 5kVA, welders over 3kVA, radio transmitters) need a separate service connection, sometimes at your own cost for corrective equipment.

When IESCO Can Disconnect for Non-Compliance

Only after giving you 7 business days’ written notice and you still haven’t complied.

Bottom line: You have a real right to 24-hour notice before inspection (theft cases aside) – and IESCO can’t disconnect you for non-compliance without a full 7-day written notice first.

Similar Posts

  • Disconnection and Reconnection

    Disconnection and Reconnection Why a Connection Gets Disconnected Non-payment, electricity theft, illegal self-reconnection, exceeding your sanctioned load, misusing your tariff category, an expired bank guarantee not renewed within 30 days, or simply requesting disconnection yourself. The Disconnection Process (Non-Payment) This is more forgiving than most people assume: You cannot be disconnected just for missing one…

  • Temporary Connection and Relocation

    Temporary Connection and Relocation When You’d Need a Temporary Connection Construction of a house, building, or plaza Weddings, festivals, exhibitions, political or religious gatherings Testing industrial equipment Any other short-term/emergency need Construction Connections Initially granted for 6 months, extendable in 3-month blocks until your project finishes. Apply on the standard new-connection form (Annex-I) with: Ownership…

  • Metering Installation

    Metering Installation Where Your Meter Gets Installed Usually placed outside your premises, at a height reachable without climbing equipment. If it’s on your property, you’re responsible for its safe custody; if IESCO installs it on a pole/structure, that responsibility is theirs. Multi-occupant buildings get individually labeled meters per unit. If Your Meter Is Stolen or…

  • Violation of Instructions

    Violation of Instructions If IESCO Doesn’t Respond, or You’re Unhappy With the Outcome You’re not stuck. There’s a real escalation path once your original complaint doesn’t get resolved fairly: Provincial Office of Inspection (POI) – file here for issues around metering, billing, or tariff collection (under Section 38 of the Electricity Act). If you disagree…

  • Understanding IESCO Tariff

    Understanding IESCO Tariff What "Tariff" Actually Means Your IESCO bill isn’t priced randomly – every rate you pay is approved by NEPRA (Pakistan’s electricity regulator) and officially notified by the government. IESCO cannot charge anything outside this approved schedule. If a rate on your bill ever looks off, you have the right to ask IESCO…

Leave a Reply

Your email address will not be published. Required fields are marked *