Disconnection and Reconnection

Why a Connection Gets Disconnected

Non-payment, electricity theft, illegal self-reconnection, exceeding your sanctioned load, misusing your tariff category, an expired bank guarantee not renewed within 30 days, or simply requesting disconnection yourself.

The Disconnection Process (Non-Payment)

This is more forgiving than most people assume:

  • You cannot be disconnected just for missing one month’s bill, as long as you had no prior outstanding balance.
  • If you miss payment, IESCO gives 7 clear days’ notice with your second bill to clear dues before disconnection.
  • If you still don’t pay by the second bill’s due date, disconnection follows.
  • If a third month also goes unpaid, IESCO issues an Equipment Removal Order and physically removes your meter – restoring supply after that requires full payment of everything owed, not just the recent bill.
  • If you’re on an approved installment plan and keep paying, you won’t be disconnected – but missing an installment means disconnection without further notice, and restoration then requires at least 50% of your total dues upfront.
  • If you own multiple connections and one defaults, IESCO can apply that unpaid balance against your other active connections.

Requesting Disconnection Yourself

  • Temporary (e.g., relocating): allowed for up to 11 months, final bill must be settled first, and reconnecting within 7 days of the disconnection period ending is fee-free.
  • Permanent: apply to the load sanctioning officer, settle the final bill, and you’ll get a formal disconnection order. You won’t be liable for misuse of the site afterward if IESCO hasn’t removed the equipment yet.

Getting Reconnected

  • Reconnection is allowed for up to 10 years after disconnection, once all dues are cleared.
  • Material removed is stored for 365 days free of extra charge if you reconnect within that window.
  • Reconnect between 1-3 years later: you get credit for the removed material’s depreciated value.
  • Reconnect after 3 years: no material credit.
  • Past 3 years and up to 10 years, you can alternatively apply for a fresh new connection instead. Past 10 years, reconnection isn’t an option at all – you must apply as a new connection, though you’ll be given priority processing.

If a Disconnection Was Wrongful

If NEPRA or a court later rules your disconnection invalid, you owe nothing – no reconnection fee, no minimum charges, no fresh security deposit.

Bottom line: One missed bill alone can’t get you disconnected – it takes a second unpaid notice cycle. If it happens, act before the third month; that’s when equipment removal kicks in.

Similar Posts

  • Consumer Complaints

    Consumer Complaints Where to File a Complaint Any IESCO Consumer Services Center or the One-Window Operation desk at your local office. You’ll get an acknowledgement with a defined response timeline – these aren’t open-ended. Billing Complaint Timelines (Know Your Rights) Wrong meter reading or calculation error: resolved within 7 days Tariff dispute: within 30 days…

  • Metering Installation

    Metering Installation Where Your Meter Gets Installed Usually placed outside your premises, at a height reachable without climbing equipment. If it’s on your property, you’re responsible for its safe custody; if IESCO installs it on a pole/structure, that responsibility is theirs. Multi-occupant buildings get individually labeled meters per unit. If Your Meter Is Stolen or…

  • Temporary Connection and Relocation

    Temporary Connection and Relocation When You’d Need a Temporary Connection Construction of a house, building, or plaza Weddings, festivals, exhibitions, political or religious gatherings Testing industrial equipment Any other short-term/emergency need Construction Connections Initially granted for 6 months, extendable in 3-month blocks until your project finishes. Apply on the standard new-connection form (Annex-I) with: Ownership…

  • Violation of Instructions

    Violation of Instructions If IESCO Doesn’t Respond, or You’re Unhappy With the Outcome You’re not stuck. There’s a real escalation path once your original complaint doesn’t get resolved fairly: Provincial Office of Inspection (POI) – file here for issues around metering, billing, or tariff collection (under Section 38 of the Electricity Act). If you disagree…